Home Skip Navigation Links Our Projects Completed Projects 2010 Buduk Lower Basic School 2010
 
Buduk Lower Basic School 2010
1 of 3: Buduk Lower Basic School 2010
2 of 3: Buduk Lower Basic School 2010
3 of 3: Buduk Lower Basic School 2010

Buduk Lower Basic School 2010

Nianija District, Central River Division

Amount Needed:  £1,640

Renovation of a handpump well and toilet

Funding has been issued to this school and work is complete.

 The school, which has 352 pupils aged between 7 and 12 years old, desperately needed to renovate its toilet block and a well.

The existing well built in 1989 urgently needed to be renovated as it was unusable. As well as providing safe drinking water and water to wash hands with, the new well will also be used to provide water for a vegetable garden.

Buduk Lower Basic School 2010
Buduk Lower Basic School 2010
Buduk Lower Basic School 2010
Buduk Lower Basic School 2010
Buduk Lower Basic School 2010
Buduk Lower Basic School 2010
Buduk Lower Basic School 2010
Buduk Lower Basic School 2010
 
1 of 8: Buduk Lower Basic School 2010
2 of 8: Buduk Lower Basic School 2010
3 of 8: Buduk Lower Basic School 2010
4 of 8: Buduk Lower Basic School 2010
5 of 8: Buduk Lower Basic School 2010
6 of 8: Buduk Lower Basic School 2010
7 of 8: Buduk Lower Basic School 2010
8 of 8: Buduk Lower Basic School 2010